A Ellery company - serving North Hollywood, CA
ADU Site Prep & Utilities in North Hollywood, CA | Ellery ADU Studio North Hollywood

ADU Site Prep & Utilities in North Hollywood - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

15+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Trusted ADU Site Prep & Utilities for North Hollywood Homeowners

Our ADU Site Prep & Utilities cost guide explains that North Hollywood projects typically run $35,000-$95,000 depending on scope, with foundation and grading work starting around $18,000 and full utility packages including electrical, plumbing, and gas running higher for detached units. Most North Hollywood homeowners complete this phase in 4-8 weeks before construction begins, though LADBS permit timelines and SCE service upgrade queues can extend that window. We’re Ellery ADU Studio, a design-build practice led by Nadia Ellery that has handled the site prep and utility work for over 900 ADUs since 2015, every one with a written price before ground breaks and a documented photo record of what we found underground.

Call (424) 407-8266

North Hollywood’s aging infrastructure creates predictable headaches for ADU builders. Many lots in the NoHo Arts District and the neighborhoods south of Victory Boulevard still run on 100-amp electrical service, inadequate for a second dwelling. Clay-heavy soils in the eastern Valley, combined with the shallow water table that rises after winter storms, complicate foundation work. We’ve trenched lateral lines on Burbank Boulevard properties where the original 1950s clay sewer pipe had partially collapsed, and we’ve pulled permits for gas line extensions where the existing meter couldn’t handle the additional load. Because we handle design, permitting, and construction under one contract, the person who specifies your electrical panel upgrade also builds your ADU. No designer-builder blame gap. Call (424) 407-8266 for a written estimate.

What Our ADU Site Prep & Utilities Service Includes

Foundation & Grading

Foundation work is the literal bedrock of any ADU, and in North Hollywood it starts with understanding what you’re building on. We pour stem-wall foundations for detached units, slab-on-grade for garage conversions, and occasionally pier foundations for hillside lots in the foothills near Mulholland. Grading corrects slope, ensures drainage away from structures, and satisfies LADBS requirements for positive drainage, which means water must flow away from both the primary residence and the ADU. Our geotechnical review identifies expansive soil conditions common to the San Fernando Valley, and we specify the right footing depth and rebar schedule before the permit set goes to the city. Every foundation proposal includes a written line-item price for excavation, compaction testing, concrete, and the documented photo record of each pour.

Foundation & Grading

Electrical Panel Upgrade

Most North Hollywood homes built before 1990 carry 100-amp service, insufficient for an ADU with modern HVAC, electric cooking, and EV charging. We coordinate with Southern California Edison to size your new service, typically 200 amps for a detached ADU with full electric appliances, or 150 amps for smaller junior ADUs with gas cooking. The upgrade requires SCE approval, a new meter socket, and often a trench from the pole or underground transformer to your new panel location. We pull the permit, meet the inspector, and handle the coordination so your ADU construction isn’t waiting on utility bureaucracy. Under Haven Standard Clause 1, the full electrical scope, including SCE fees and potential transformer upgrades, is priced in writing before we start.

Electrical Panel Upgrade

Plumbing Lateral

The plumbing lateral is the underground pipe connecting your home’s sewer line to the city main, and in North Hollywood these are often original clay or cast-iron lines from the 1940s-1960s. We camera-inspect every lateral before design finalization, because a partially collapsed line will fail inspection and add weeks to your project. For detached ADUs, we typically trench a new 4-inch ABS lateral from the ADU bathroom group to the existing main, or to a new connection point if the original line lacks capacity. In the home stretch of a recent project on Tujunga Avenue, we found the existing 3-inch clay line had a 2-foot section of root intrusion that would have backed up within a year of ADU occupancy. We replaced it during site prep, documented the condition with photos, and the client avoided a future emergency.

Plumbing Lateral

Gas Line Extension

Gas line work in North Hollywood requires a SoCalGas permit and pressure testing, and the existing meter must be sized for the additional load of an ADU water heater, furnace, or cooking appliances. We calculate total BTU demand, verify meter capacity, and specify either a meter upgrade or a dedicated second meter depending on your ADU configuration. Trenching for gas lines in North Hollywood often encounters the same utility congestion as electrical: fiber, cable, and old irrigation lines layered in the easement. We call USA North 811 for utility locates, hand-dig near marked lines, and photograph every joint before backfill. If you’re considering a prefab unit from ADU Site Prep & Utilities in North Hollywood partners like Abodu or Cover, we coordinate their gas specifications with our field work so the module arrives to a ready connection.

Gas Line Extension

Landscaping & Hardscape

Site prep doesn’t end at the ADU walls. LADBS and the City of Los Angeles require fire access pathways, hardscape for parking if your ADU triggers additional requirements, and restoration of areas disturbed by utility trenches. We grade for drainage swales, install permeable pavers where the city requires stormwater management, and rebuild fences, gates, and retaining walls affected by construction. In North Hollywood’s flat lots, we often see pooling near alley-access ADUs where the original grade was never properly sloped. We fix that during site prep, not as a change order later. The Haven Standard Clause 5 locks the landscaping scope at signing, so your backyard isn’t a mud pit when the builder leaves.

Landscaping & Hardscape
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (424) 407-8266

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Brands We Service for ADU Site Prep & Utilities

Professional designer presenting custom ADU architectural plans to a client.
Brands We Service for ADU Site Prep & Utilities

We specify and coordinate prefab and modular systems from Tuff Shed, James Hardie, Abodu, Cover, Dvele, Mighty Buildings, Boxabl, and Plant Prefab, handling their site requirements within our single-contract model. For Tuff Shed structures, we’ve prepared dozens of North Hollywood lots with the compacted gravel pad and anchored connections their engineered foundation demands, typically 6 inches of compacted Class 2 base with embedded J-bolts at specified spacing. James Hardie siding systems require specific moisture barriers and fastening patterns that we integrate into the weather-resistant barrier specification during site prep, not after framing is complete. Whether your ADU arrives as a pre-wired module from Abodu or a panelized system from Cover, we coordinate the rough utility stub-outs so their installation connects cleanly to our underground work.

Our prefab fluency matters because these brands have precise site requirements that generic contractors often miss. Dvele units need larger electrical service than conventional builds due to their integrated smart systems. Mighty Buildings’ polymer composite walls require specific foundation tolerances. We’ve learned these specifications through direct coordination, not guesswork. Whether you have one of these brands or any other make, we can prepare your North Hollywood lot to receive it.

Signs You Need ADU Site Prep & Utilities Right Now

  • Your main electrical panel is already warm or trips when the AC runs. This indicates your service is near capacity before adding an ADU load. In North Hollywood’s summer heat, overloaded panels are a genuine fire hazard. We assess actual load with a clamp meter, size the upgrade, and coordinate with SCE before your ADU design is finalized.
  • Your sewer line has backed up more than once in two years. Recurring backups in older North Hollywood homes often mean a compromised lateral. Camera inspection during site prep reveals the condition before you’re committed to a construction timeline. Replacing a failed lateral mid-project adds 3-4 weeks and significant cost.
  • Your backyard floods or stays muddy for days after rain. Poor drainage kills ADU foundations. The clay soils in North Hollywood’s eastern neighborhoods hold water, and without proper grading, that moisture wicks into slab edges. We grade for positive drainage and specify French drains or daylighted pipes where needed.
  • Your gas meter is original to a 1950s-1970s build. Original meters in North Hollywood are typically sized for the original home’s load only. Adding an ADU water heater and furnace often exceeds capacity. We verify BTU ratings and include meter upgrade costs in your written quote.
  • You’re considering a garage conversion but the slab is cracked and uneven. Garage slabs in North Hollywood are typically non-structural, 3-4 inches thick without rebar or vapor barrier. ADU occupancy requires a proper foundation. We assess thickness, test for vapor transmission, and specify either slab reinforcement or replacement with a structural slab designed for residential loads.

Our ADU Site Prep & Utilities Process - Step by Step

Architect designing blueprints for accessory dwelling unit construction
Our ADU Site Prep & Utilities Process - Step by Step
  1. 1
    Site assessment and utility locate. We walk your North Hollywood property with you, identify existing service points, and call USA North 811 for underground utility marking. We photograph current conditions, measure setbacks from property lines, and note any trees, easements, or access constraints that affect trenching routes. You receive these photos as the first entry in your documented record.
  2. 2
    Geotechnical and utility condition evaluation. For foundation work, we review soils reports or commission borings if the lot has fill or hillside conditions. For utilities, we camera-sewer laterals and load-test electrical panels. In North Hollywood, we often find original clay sewer pipe, aluminum wiring in 1960s builds, or undersized gas meters. We tell you exactly what we found, not what we think it means, and price remediation in your written quote.
  3. 3
    Permit-ready drawings and LADBS submittal. Our permit set includes site plans showing utility routes, foundation details with rebar schedules, and electrical load calculations. Because we’re a design-build studio, these drawings are produced by the same team that builds from them. No translation errors between designer and contractor. We handle LADBS plan check responses and corrections.
  4. 4
    Coordinated utility work and inspection. We schedule SCE, SoCalGas, and LADWS (Los Angeles Department of Water and Power) coordination so trades aren’t tripping over each other. Electrical panel upgrades require SCE disconnect and reconnect, which we schedule for the same day as our panel swap to minimize outage time. Every trench, joint, and connection is photographed before backfill.
  5. 5
    Final inspection, documentation, and handoff to construction. We pass LADBS inspection, compile your photo record, and confirm all utilities are live and metered. The site is graded, hardscaped per plan, and ready for the ADU structure. Your written warranty and 365-Day Done Right Promise are in effect from this point forward.
Get the price in writing before anything starts.Serving North Hollywood - a real person answers, day or night.
Call now

How Much Does ADU Site Prep & Utilities Cost in North Hollywood?

A typical foundation and grading package for a detached ADU in North Hollywood runs $18,000-$42,000, with garage conversion slabs at the lower end and hillside pier foundations at the upper. Electrical panel upgrades, including SCE coordination and permit fees, typically range $4,500-$12,000 depending on whether the service mast needs relocation or the transformer requires upgrade. Plumbing lateral replacement, common in older North Hollywood neighborhoods, runs $6,000-$15,000 for trenching and pipe, more if we hit unexpected groundwater or need to tunnel under existing hardscape. Gas line extension with meter sizing adds $3,500-$8,500. Landscaping and hardscape restoration typically closes out at $8,000-$18,000 for fire access paths, drainage, and fence rebuild.

Several factors move these ranges. Depth to sewer main affects trenching cost significantly; North Hollywood’s flat terrain helps, but alley-access properties often have longer runs. SCE transformer upgrade queues can add 8-12 weeks and several thousand dollars if your neighborhood infrastructure is already near capacity. Soil conditions vary block by block, and we’ve seen expansive clay in the Valley Village border area that required deeper footings than initially estimated. We price for these contingencies upfront, not as change orders later.

Under Haven Standard Clause 1, every project receives a written line-item price before any work begins. The scope is locked under Clause 5. No door-side upsells, no “we found something unexpected” surcharges that weren’t in your original quote. Our free estimate includes the full permit set, all utility coordination, and the documented photo record. To avoid overpaying, get a second opinion on any estimate already in hand. We offer this free, and we’ll show you exactly what each line item covers.

ADU Site Prep & Utilities Near North Hollywood - Our Service Area

Architect designing an ADU floor plan with a drafting pencil
ADU Site Prep & Utilities Near North Hollywood - Our Service Area

We handle ADU site prep and utilities throughout the San Fernando Valley and adjacent metro core neighborhoods, including ADU Site Prep & Utilities in Studio City, ADU Site Prep & Utilities in Burbank, Van Nuys, Sherman Oaks, West Hollywood, Beverly Hills, Glendale, West Los Angeles, Northridge, Tarzana, and the broader Los Angeles basin. Response times for initial site assessment are typically 2-3 business days in North Hollywood proper, 3-5 days for outlying Valley locations. We’ve worked on properties from the NoHo Arts District to the hillside lots near Laurel Canyon, and we understand the distinct utility constraints of each area, from Burbank’s separate utility jurisdiction to the older infrastructure in Van Nuys post-war tracts.

Serving North Hollywood, CA - Our Local Coverage Area

We’re based in the North Hollywood area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions - ADU Site Prep & Utilities in North Hollywood

Contractors framing metal wall studs for a garage conversion ADU project
Frequently Asked Questions - ADU Site Prep & Utilities in North Hollywood

Schedule Your ADU Site Prep & Utilities Service in North Hollywood Today

Call (424) 407-8266 to schedule your free site assessment and written estimate. Nadia Ellery and our team will walk your North Hollywood property, identify the specific utility and foundation work your ADU requires, and return a line-item quote under Haven Standard Clause 1 before any ground breaks. A live person answers 24/7, and we offer a free second opinion on any written estimate already in your hands.

Written by Nadia Ellery, Owner at Ellery ADU Studio, serving North Hollywood since 2015.

Why North Hollywood Chooses Ellery ADU Studio North Hollywood

We set the standard for adu site prep & utilities in North Hollywood.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Hollywood

Getting your adu site prep & utilities handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu site prep & utilities needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in North Hollywood - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Hollywood Customers Say

Trusted by homeowners across North Hollywood and surrounding areas.

★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer
★★★★★

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

Benedict H. · Verified customer
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer

Ready for ADU Site Prep & Utilities in North Hollywood?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in North Hollywood.

(424) 407-8266

Request a Free Estimate in North Hollywood

Tell us about your adu site prep & utilities needs - we'll respond within the hour.

By requesting your free estimate, you confirm you have read our Privacy Policy and agree to be contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch